13 min

Prioritization Using Critical Path Thinking Developer Tea

    • Technology

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

13 min

Top Podcasts In Technology

Acquired
Ben Gilbert and David Rosenthal
Lex Fridman Podcast
Lex Fridman
The TED AI Show
TED
All-In with Chamath, Jason, Sacks & Friedberg
All-In Podcast, LLC
Waveform: The MKBHD Podcast
Vox Media Podcast Network
Lenny's Podcast: Product | Growth | Career
Lenny Rachitsky

More by Spec.

Developer Tea
Jonathan Cutrell
Design Details
Brian Lovin, Marshall Bock
Swift Unwrapped
JP Simard, Jesse Squires, Spec Network, Inc.
Toolsday
Una Kravets, Chris Dhanaraj
Does Not Compute
Sean Washington, Rockwell Schrock
Fragmented - An Android Developer Podcast
Donn Felker, Kaushik Gopal