13 min

Prioritization Using Critical Path Thinking Developer Tea

    • Technology

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

13 min

Top Podcasts In Technology

Acquired
Ben Gilbert and David Rosenthal
Lex Fridman Podcast
Lex Fridman
Darknet Diaries
Jack Rhysider
Deep Questions with Cal Newport
Cal Newport
Hard Fork
The New York Times
Apple Events (video)
Apple

More by Spec.

Design Details
Brian Lovin, Marshall Bock
Developer Tea
Jonathan Cutrell
Swift Unwrapped
JP Simard, Jesse Squires, Spec Network, Inc.
Toolsday
Una Kravets, Chris Dhanaraj
Does Not Compute
Sean Washington, Rockwell Schrock
Fragmented - An Android Developer Podcast
Donn Felker, Kaushik Gopal