Prioritization Using Critical Path Thinking Developer Tea

    • Technology

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

13 min

Top Podcasts In Technology

All-In with Chamath, Jason, Sacks & Friedberg
All-In Podcast, LLC
Vikasietotila
Olli Sulopuisto, Kari Haakana, Panu Räty
Herrasmieshakkerit
Mikko Hyppönen & Tomi Tuominen
Lex Fridman Podcast
Lex Fridman
Acquired
Ben Gilbert and David Rosenthal
Hard Fork
The New York Times

More by Spec.

Fragmented - An Android Developer Podcast
Donn Felker, Kaushik Gopal
Developer Tea
Jonathan Cutrell
Design Details
Brian Lovin, Marshall Bock
Toolsday
Una Kravets, Chris Dhanaraj
Swift Unwrapped
JP Simard, Jesse Squires, Spec Network, Inc.
Does Not Compute
Sean Washington, Rockwell Schrock