13 min

Prioritization Using Critical Path Thinking Developer Tea

    • Technology

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

13 min

Top Podcasts In Technology

خرفني عن فلسطين | Tell me about Palestine
Tala morrar
Apple Events (video)
Apple
Tech Life
BBC World Service
Lex Fridman Podcast
Lex Fridman
This Week in Startups
Jason Calacanis
WSJ’s The Future of Everything
The Wall Street Journal

More by Spec.

Developer Tea
Jonathan Cutrell
Fragmented - An Android Developer Podcast
Donn Felker, Kaushik Gopal
Design Details
Brian Lovin, Marshall Bock
Swift Unwrapped
JP Simard, Jesse Squires, Spec Network, Inc.
Toolsday
Una Kravets, Chris Dhanaraj
Does Not Compute
Sean Washington, Rockwell Schrock