In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

13 min

Top Podcasts In Technology

The TED AI Show
TED
Machine Learning Guide
Dept
Lex Fridman Podcast
Lex Fridman
Waveform: The MKBHD Podcast
Vox Media Podcast Network
JS Party: JavaScript, CSS, Web Development
Changelog Media
Security Cryptography Whatever
Deirdre Connolly, Thomas Ptacek, David Adrian

More by Spec.

Design Details
Brian Lovin, Marshall Bock
Developer Tea
Jonathan Cutrell
Swift Unwrapped
JP Simard, Jesse Squires, Spec Network, Inc.
Toolsday
Una Kravets, Chris Dhanaraj
Does Not Compute
Sean Washington, Rockwell Schrock
Fragmented - An Android Developer Podcast
Donn Felker, Kaushik Gopal