16 min

Raising the Bar: Part 3 The Big Green Q&A

    • Cursos

Neville Grunwald of Wates Group, Darren Burford of ALUK and Graham Hackley of Century Facades join Dan Brown and Martin Sadler of GQA Qualifications to discuss the necessary culture change for high-rise, high-risk envelope contracting in the shadow of the Grenfell Tragedy and The Building Safety Act.

In Part 3, the panel explore the ease and frequency which specifications change is invited in current envelope contracting but ask, will the introduction of the Golden Thread of information and the process of design validation and vetting through the Gateway framework make a specification change less inviting to Duty Holders through exposed risk to programme and will the passage of product specification and design through the Gateways be secured by those with their organisational, individual and product competency measures in place?  To conclude the Raising The Bar series, the panel answer questions from the industry.
See omnystudio.com/listener for privacy information.

Neville Grunwald of Wates Group, Darren Burford of ALUK and Graham Hackley of Century Facades join Dan Brown and Martin Sadler of GQA Qualifications to discuss the necessary culture change for high-rise, high-risk envelope contracting in the shadow of the Grenfell Tragedy and The Building Safety Act.

In Part 3, the panel explore the ease and frequency which specifications change is invited in current envelope contracting but ask, will the introduction of the Golden Thread of information and the process of design validation and vetting through the Gateway framework make a specification change less inviting to Duty Holders through exposed risk to programme and will the passage of product specification and design through the Gateways be secured by those with their organisational, individual and product competency measures in place?  To conclude the Raising The Bar series, the panel answer questions from the industry.
See omnystudio.com/listener for privacy information.

16 min