13 min

Prioritization Using Critical Path Thinking Developer Tea

    • Technology

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

13 min

Top Podcasts In Technology

Lex Fridman Podcast
Lex Fridman
The Vergecast
The Verge
CISO Series Podcast
David Spark, Mike Johnson, and Andy Ellis
Lean Startup
Lean Startup
Defense in Depth
David Spark
Primary Technology
Stephen Robles and Jason Aten

More by Spec.

Swift Unwrapped
JP Simard, Jesse Squires, Spec Network, Inc.
Toolsday
Una Kravets, Chris Dhanaraj
Does Not Compute
Sean Washington, Rockwell Schrock
Fragmented - An Android Developer Podcast
Donn Felker, Kaushik Gopal
Developer Tea
Jonathan Cutrell
Design Details
Brian Lovin, Marshall Bock