13 min

Prioritization Using Critical Path Thinking Developer Tea

    • Technology

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

13 min

Top Podcasts In Technology

Acquired
Ben Gilbert and David Rosenthal
Romkapsel
Bauer Media
Hard Fork
The New York Times
The TED AI Show
TED
Lex Fridman Podcast
Lex Fridman
Teknologi og mennesker
Oslo Business Forum og Atea

More by Spec.

Developer Tea
Jonathan Cutrell
Design Details
Brian Lovin, Marshall Bock
Swift Unwrapped
JP Simard, Jesse Squires, Spec Network, Inc.
Fragmented - An Android Developer Podcast
Donn Felker, Kaushik Gopal
Toolsday
Una Kravets, Chris Dhanaraj
Does Not Compute
Sean Washington, Rockwell Schrock