Ep.337 - The Takt Production System - Part 1

Elevate Construction Podcast

Takt Planning & Integrated Control has not yet taken hold throughout the world like it should, and it needs to be empowered as the main scheduling tool to either replace the Critical Path Method or at a minimum, to hold it accountable and govern it. One of the main reasons the construction industry still typically produces projects behind schedule-with a crash landing at the end and with poor quality-is because we incentivize this with the variation, lack of transparency, and chaos that comes from CPM scheduling. It is time for this to stop, and Takt is the solution.