Missouri River Basin Water Management - Fort Peck Test Flows - Weekly Call - 05/22/24 Missouri River Basin Water Management

    • Government

Test flows from Fort Peck Dam to comply with the 2018 Biological Opinion were lowered to a target of 10,000 cfs (at Wolf Point) and will held through mid-June. The test is required under the Endangered Species Act for operation of the Missouri River Mainstem Reservoir System. These weekly virtual meetings are aimed at updating the public on test progress, monitoring and planned operations.

Test flows from Fort Peck Dam to comply with the 2018 Biological Opinion were lowered to a target of 10,000 cfs (at Wolf Point) and will held through mid-June. The test is required under the Endangered Species Act for operation of the Missouri River Mainstem Reservoir System. These weekly virtual meetings are aimed at updating the public on test progress, monitoring and planned operations.

Top Podcasts In Government

Strict Scrutiny
Crooked Media
Anne Hidalgo - Paris en Commun
Paris en Commun
5-4
Prologue Projects
The Lawfare Podcast
The Lawfare Institute
Red Eye Radio
Cumulus Podcast Network
Civics 101
NHPR

More by DVIDS

DIA Connections
Defense Intelligence Agency
Inside the Castle
U.S. Army Corps of Engineers Headquarters
The Contracting Experience
Air Force Materiel Command
NATO Review
Natochannel
DoD News Daily
Defense.gov
The USAACE-8 Podcast
U.S. Army Aviation Center of Excellence