In this episode of the Data Center Counsel podcast, Jared Berg and Bryan Clark talk with Ted Duver about the regulatory forces driving data centers to develop on-site, behind-the-meter generation. They examine how long interconnection timelines, grid infrastructure constraints and evolving regulatory frameworks — particularly in PJM and ERCOT — are pushing developers toward greater control over power supply in pursuit of “speed to power” and Five 9s reliability.
The group compares ERCOT’s energy-only market and recent Senate Bill 6 reforms with more traditional ISO/RTO markets, highlighting regulatory uncertainty, cost allocation debates and the growing role of co-located generation.
Information
- Show
- FrequencyUpdated Biweekly
- PublishedFebruary 17, 2026 at 2:00 PM UTC
- Length43 min
- Season1
- Episode3
- RatingClean