223 episodes

The Critical Path is a talk show contemplating the causality of success and failure in the evolving story of mobile computing and related industries. Using Apple as a lens to look at existing and emerging tech markets, we try to understand what it means to be great. Hosted by Horace Dediu, Anders Brownworth, and Judd Rubin.

The Critical Path 5by5

    • Tech News
    • 4.9, 1.1K Ratings

The Critical Path is a talk show contemplating the causality of success and failure in the evolving story of mobile computing and related industries. Using Apple as a lens to look at existing and emerging tech markets, we try to understand what it means to be great. Hosted by Horace Dediu, Anders Brownworth, and Judd Rubin.

Customer Reviews

4.9 out of 5
1.1K Ratings
1.1K Ratings
Ajwpip ,

Like the new addition

I enjoy the knowledgeable and ever insightful Horace and Anders. The addition of Judd Rubin added some good back and forth and a spit of humor. The discussion of Apple’s new concept of longer lasting offerings was interesting. One wonders if this shift to increased durability also speaks of an inability to bring revolutionary and paradigm shifting new tech on a semi-annual basis as Apple has done in the past. Or at least no faster than their competitors can do so or create their own versions. Mr. Rubin was useful to hear how generally informed but not expert end users may react to these moves. Will keep listening.

cwagner88 ,

One of my favorite podcasts

I listen religiously. Always look forward to new episodes. The other dude besides Horace on the latest episode was not good. Bad jokes and poor commentary and analysis.

Ikefrom ,

Jefferson Airplane

Horace is a rare individual- a researcher and a toolmaker. Amazingly, every episode is packed with interesting mix of insight and data articulated into stories intuitively. Moises was perhaps the most engaged co-host so be sure to check the earlier episodes as well. This podcast is some of the best time investment you’ll find anywhere if you’re interested in change as agency.

Top Podcasts In Tech News

Listeners Also Subscribed To

More by 5by5