17 episodes

The electricity grid is at the centre of the energy transition, and our journey to net zero by 2050. This podcast from eSmart Networks is your guide to how the grid will support the biggest shift in energy usage since the 1950’s – join us for an exciting ride! Visit us on LinkedIn at https://www.linkedin.com/company/esmart-networks, find our YouTube channel at https://www.youtube.com/channel/UCm1xJpPsmcC2zrqg-6Qn-XQ

The Grid Brian Moorhead

    • Business
    • 5.0 • 1 Rating

The electricity grid is at the centre of the energy transition, and our journey to net zero by 2050. This podcast from eSmart Networks is your guide to how the grid will support the biggest shift in energy usage since the 1950’s – join us for an exciting ride! Visit us on LinkedIn at https://www.linkedin.com/company/esmart-networks, find our YouTube channel at https://www.youtube.com/channel/UCm1xJpPsmcC2zrqg-6Qn-XQ

    SF6 Transition: Impact and Risks for Project Developers

    SF6 Transition: Impact and Risks for Project Developers

    In this episode, we discuss the transition away from SF6 in switchgear across all voltages and how this might impact grid connections for energy transition projects such as EV charging, Renewables and Industrial Electrification. 
    Whilst transitioning away from SF6 is necessary, managing the impact of the transition and its impact on projects and the wider energy transition is also essential.  
    The SF6 transition is underway but at different speeds and scales across the different network companies in the UK, which may cause trouble for project developers.
    We also discuss some of the key risks and considerations, including spatial constraints and timescale challenges, that project developers should be aware of.
    ➡️Listen Now:
    Spotify: https://ow.ly/qXil50PY0fX
    Apple Podcast: https://ow.ly/xPfh50PY0f4
    Google Podcast: https://ow.ly/mX8W50PY0fh
    YouTube: https://ow.ly/jYQl50PY0f6
    Web Player: https://ow.ly/pjvQ50PY0f5
    Like and subscribe to stay tuned.
    Follow us on our social media channels:
    LinkedIn: https://www.linkedin.com/company/esmartnetworks/
    Instagram: https://www.instagram.com/esmartnetworks/
    Twitter: https://twitter.com/esmartnetworks1
    Facebook: https://www.facebook.com/eSmartNetworks

    • 22 min
    Behind the Meter Generation & Storage Connections

    Behind the Meter Generation & Storage Connections

    In this new episode, Brian Moorhead and David McDonald from eSmart Networks get together to discuss the capacity issues facing new renewable connections. With a large chunk of requests and enquiries to assist with 'Private wire' or 'behind the meter' connections. This episode summarises the potential grid issues with these installs and what you need to know before taking a private wire project forward.
    We cover fault level impact, your legal obligations to get permission from the network operator and other considerations to be aware of when connecting Solar/Battery or Wind with a demand connection such as new commercial or industrial premises, an EV hub or a data centre.
    If you want to get in touch with eSmart Network, don’t hesitate to write to thegrid@esmartnetworks.co.uk and don’t forget to follow and subscribe so you don’t miss out on upcoming episodes. If you would like to request a specific topic, don’t hesitate to write to thegrid@esmartnetworks.co.uk and don’t forget to follow and subscribe so you don’t miss out on upcoming episodes. 
    ➡️Listen Now:
    YouTube: https://ow.ly/AYOr50PacRj
    Spotify: https://ow.ly/PzEj50PacRl
    Apple: https://ow.ly/Awmj50PacRi
    Google: https://ow.ly/6zkc50PacRk
    Like and subscribe to stay tuned.
    Follow us on our social media channels:
    LinkedIn: https://www.linkedin.com/company/esmartnetworks/
    Instagram: https://www.instagram.com/esmartnetworks/
    Twitter: https://twitter.com/esmartnetworks1
    Facebook: https://www.facebook.com/eSmartNetworks

    • 26 min
    Connecting Tomorrow's Homes to Today's Grid with Triconnex

    Connecting Tomorrow's Homes to Today's Grid with Triconnex

    In this new collaboration episode, Brian Moorhead and David McDonald from eSmart Networks get together with Chris Doré, Business Development Director of both eSmart Networks and sister company TriConnex to discuss the challenges house builders are facing when connecting their schemes to the grid.
    Get an insight into leading UK multi-utility company TriConnex, what they do, and the launch of their new service offering ‘Grid Dynamix’. Find out how TriConnex are assisting developers with connecting their schemes to the grid through their new Grid Dynamix service and understand the benefit for developers in the ever-changing world of electricity connections.
    The team also dive deep into electrification of vehicles and heating, as well as the new future homes standard and what TriConnex are doing to come away from gas. Furthermore, with changing regulations making power more difficult for housing developers, get the latest intel on capacity crunch, SCR, milestones and much more.
    Read more about TriConnex’s new Grid Dynamix service here: https://triconnex.co.uk/multi-utilities/grid-dynamix/
    If you want to get in touch with eSmart Network, don’t hesitate to write to thegrid@esmartnetworks.co.uk and don’t forget to follow and subscribe so you don’t miss out on upcoming episodes. If you would like to request a specific topic, don’t hesitate to write to thegrid@esmartnetworks.co.uk and don’t forget to follow and subscribe so you don’t miss out on upcoming episodes. 
    ➡️Listen Now:
    YouTube: https://ow.ly/AYOr50PacRj
    Spotify: https://ow.ly/PzEj50PacRl
    Apple: https://ow.ly/Awmj50PacRi
    Google: https://ow.ly/6zkc50PacRk
    Like and subscribe to stay tuned.
    Follow us on our social media channels:
    LinkedIn: https://www.linkedin.com/company/esmartnetworks
    Instagram: https://www.instagram.com/esmartnetworks/
    Twitter: https://twitter.com/esmartnetworks1
    Facebook: https://www.facebook.com/eSmartNetworks

    • 48 min
    SCR: Connection Cost & Charging Reform (1st April 23)

    SCR: Connection Cost & Charging Reform (1st April 23)

    From the 1st of April 2023, grid connection regulation has changed significantly. 
    On the whole, the headline is very positive in that demand connections no longer pay for reinforcement costs, subject to some exceptions. However the exceptions are more complicated than you might think.  
    Whilst commercial feasibility should increase for many projects. more projects are also expected to experience time delays and the trade off between cost and time will become an increasing focus for many developers.
    In addition, extra regulation has been brought in for connecting customers to comply with. 'Speculative projects' (particularly aimed at housing development) are now regulated for and more likely to be penalised whilst 'phased capacity' planning is also now a regulated thing which is encouraged through the new regulations (and likely to be essential for many projects). Flexible connections are also now more regulated, opening up even more optionality in how you connect to the grid.
    In our latest podcast, we explore the complexities of the new regulations to highlight the new hurdles that developers need to be aware of and our recommendations on how to navigate the increase in both optionality and complexity of the new grid connection regime.
    ➡️Listen Now:
    YouTube: http://ow.ly/5q0B50NjNVx
    Spotify: http://ow.ly/sL5o50NjNVB
    Apple: http://ow.ly/ul6Q50NjNVE
    Google: http://ow.ly/nJSH50NjNVv
    Like and subscribe to stay tuned.
    Follow us on our social media channels:
    LinkedIn: https://www.linkedin.com/company/
    Instagram: https://www.instagram.com/esmartnetworks/
    Twitter: https://twitter.com/esmartnetworks1
    Facebook: https://www.facebook.com/eSmartNetworks

    • 39 min
    Transmission Capacity Crunch - Renewables & Battery Storage: Part 1

    Transmission Capacity Crunch - Renewables & Battery Storage: Part 1

    With all new #Renewable and #BatteryStorage projects in GB being quoted connection dates of 2028-2038 and beyond due to Transmission Capacity Issues, Brian and David delve into the challenges driving this.
    One episode wouldn’t cut it as this is probably the biggest topic in Renewable or BESS Development right now, so we’ll be stepping through the issue in a ‘Transmission Capacity Crunch’ Mini-series.
    Part 1 is available now, which sets the scene by covering some background on the GB Transmission Network and its interaction with Distribution Networks, the volumes of connection applications, our 2030 & 2050 capacity targets and some of the key challenges being faced by the Grid.
    In the following episodes, we’ll be getting into the challenges and solutions in more detail, along with a summary of our thoughts on what Renewable or BESS Developers & Investors should be considering. 
    Like or subscribe to stay tuned.

    • 32 min
    Energy Cloud: Solving Fuel Poverty With Surplus Renewable Power

    Energy Cloud: Solving Fuel Poverty With Surplus Renewable Power

    ​Brian Moorhead from eSmart Networks interviews Derek Roddy from Energy Cloud on how they started their not-for-profit company, the journey so far, potential future uses of the technology and growth plans for the UK.
    £10M’s of green clean electricity is regularly being dumped on the Ireland Electricity System whilst people struggle to heat their homes. Find out how Energy Cloud are using this otherwise dumped energy to provide free hot water to social housing- demonstrating yet another example of renewable generation having a direct positive impact on wider society. 
    Hear how since Christmas, the EnergyCloud platform has provided around 7 free tanks of hot water to each Energy Cloud home. Energy Cloud even sends residents a text message to inform them that wind curtailment is predicted beforehand and then afterwards to confirm that the hot water was delivered! 
    You can get in touch with EnergyCloud at https://www.energycloud.org/contact/ 
    If you want to get in touch with eSmart Network, don’t hesitate to write to thegrid@esmartnetworks.co.uk and don’t forget to follow and subscribe so you don’t miss out on upcoming episodes. If you would like to request a specific topic, don’t hesitate to write to thegrid@esmartnetworks.co.uk and don’t forget to follow and subscribe so you don’t miss out on upcoming episodes. 
    Listen to The Grid via our Podcast: https://esmartnetworks.co.uk/the-grid-podcast/
    Follow us on our social media channels: 
    LinkedIn
    Instagram 
    Twitter

    • 52 min

Customer Reviews

5.0 out of 5
1 Rating

1 Rating

Top Podcasts In Business

Ramsey Network
DOAC
Money News Network
NPR
Jocko DEFCOR Network
Vena Solutions