13 min

Prioritization Using Critical Path Thinking Developer Tea

    • Tecnología

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

13 min

Top podcasts en Tecnología

Programa tu mente
Daniel Cubillos
Whatsapp
Rami AP
Search Off the Record
Google
Bitcoin en español
Daniel Vargas
El Mac de Javi
Javi Zaldivar
Telegram Is The Future
TelegramIsTheFuture

Más de Spec.

Developer Tea
Jonathan Cutrell
Swift Unwrapped
JP Simard, Jesse Squires, Spec Network, Inc.
Toolsday
Una Kravets, Chris Dhanaraj
Does Not Compute
Sean Washington, Rockwell Schrock
Fragmented - An Android Developer Podcast
Donn Felker, Kaushik Gopal
Design Details
Brian Lovin, Marshall Bock