Title: a16z 5th Edition Pt. 4: No-Code, Just Vibes & the Top of the Class
OpenAI’s rumored $300 billion cloud pact with Oracle isn’t just another tech headline, it’s a sci-fi-sized bet on the future of AI. Host Emily Laird is talking 4.5 gigawatts of data center capacity (that’s two Hoover Dams of electricity), millions of GPUs, and enough water to make Vegas sweat. In this episode, we break down what “Stargate” really means: the billion-dollar backroom deals, the looming power crisis, and why grid stability might matter more than chips in the AI race.
Join the AI Weekly Meetups
Connect with Us: If you enjoyed this episode or have questions, reach out to Emily Laird on LinkedIn. Stay tuned for more insights into the evolving world of generative AI. And remember, you now know more about OpenAI and Oracle's upcoming builds than you did before you arrived.
Connect with Emily Laird on LinkedIn
Information
- Show
- FrequencyUpdated weekly
- Published16 September 2025 at 11:13 UTC
- Length10 min
- Episode205
- RatingClean