Connections Reform: Part 1

The Grid

Fundamental Connection Reform to change GB's 'First come, first serve' system to 'First ready, First Connect' targets implementation from January 2025.

This is big...it will directly or indirectly impact anyone seeking to connect to the Grid and will significantly change how many projects get connected. In this two-part episode Brian and David walk through what the current proposals are for the new system, what are the big unknowns and what should investors/developers be aware of at this stage.

Links to useful reference materials:

6-page summary doc from ESO: https://www.nationalgrideso.com/docum...

NGESO Connection Reform web page: https://www.nationalgrideso.com/indus...

Capacity Crunch: State of play in May podcast (covering why this is needed): [https://youtu.be/cH0r8iC3h7Q]

Listen to the podcast here:

Spotify: https://ow.ly/ooES50Saz9H

Apple Podcast: https://ow.ly/HCKH50Saza1

YouTube: https://ow.ly/M9wO50Saz9X

Web Player: https://ow.ly/YoEY50Saz9N

Follow us on our social media channels:

LinkedIn: https://www.linkedin.com/company/esma...

Instagram: https://www.instagram.com/esmartnetworks

Twitter: https://twitter.com/esmartnetworks1

Facebook: https://www.facebook.com/eSmartNetworks

若要收听包含儿童不宜内容的单集,请登录。

关注此节目的最新内容

登录或注册,以关注节目、存储单集,并获取最新更新。

选择国家或地区

非洲、中东和印度

亚太地区

欧洲

拉丁美洲和加勒比海地区

美国和加拿大