33 min

Diablo Canyon: The Devil’s in the Details; Part 2: A Mother's Work Is Never Done Fairewinds Energy Education Podcast - Nuclear Power Info

    • Technology

Utility owner Pacific Gas and Electric (PG&E) announced in June 2016 that it would shut down the Diablo Canyon nuclear power plant with its two atomic reactors by 2025 due to a joint proposal made by PG&E and several environmental and labor organizations. This action is neither the beginning nor the end to the decades long story of Diablo Canyon’s design, construction, and operation. PG&E’s promise to replace the nuclear power generated by Diablo Canyon’s two reactors with renewable energy and to no longer seek a 20-year license renewal for these atomic reactors still comes with significant costs. The two are reactors located on multiple California fault lines and now will continue to operate for nearly a decade more. In the second part to this Fairewinds Energy Education Podcast series, the Fairewinds Crew will share the troubled history of Diablo Canyon and speak with the leading activists in opposition to Diablo Canyon’s ominous 50-year presence along the California coast. The formidable San Luis Obispo Mothers for Peace have acted as legal intervenors to the construction, licensing, and operation of Diablo Canyon since 1973. During Part 2 of our Diablo Canyon series entitled “A Mother’s Work is Never Done”, Fairewinds President Maggie Gundersen talks with Mothers for Peace Vice President Linda Seeley about what it means to be a legal intervenor and why this watchdog role is so important when it comes to atomic power reactors.

Utility owner Pacific Gas and Electric (PG&E) announced in June 2016 that it would shut down the Diablo Canyon nuclear power plant with its two atomic reactors by 2025 due to a joint proposal made by PG&E and several environmental and labor organizations. This action is neither the beginning nor the end to the decades long story of Diablo Canyon’s design, construction, and operation. PG&E’s promise to replace the nuclear power generated by Diablo Canyon’s two reactors with renewable energy and to no longer seek a 20-year license renewal for these atomic reactors still comes with significant costs. The two are reactors located on multiple California fault lines and now will continue to operate for nearly a decade more. In the second part to this Fairewinds Energy Education Podcast series, the Fairewinds Crew will share the troubled history of Diablo Canyon and speak with the leading activists in opposition to Diablo Canyon’s ominous 50-year presence along the California coast. The formidable San Luis Obispo Mothers for Peace have acted as legal intervenors to the construction, licensing, and operation of Diablo Canyon since 1973. During Part 2 of our Diablo Canyon series entitled “A Mother’s Work is Never Done”, Fairewinds President Maggie Gundersen talks with Mothers for Peace Vice President Linda Seeley about what it means to be a legal intervenor and why this watchdog role is so important when it comes to atomic power reactors.

33 min

Top Podcasts In Technology

Acquired
Ben Gilbert and David Rosenthal
Lex Fridman Podcast
Lex Fridman
All-In with Chamath, Jason, Sacks & Friedberg
All-In Podcast, LLC
Hard Fork
The New York Times
TED Radio Hour
NPR
Darknet Diaries
Jack Rhysider