Continuing on the journey we started in the last episode, Nick and I went to the next project where we got to install the types of water retention features that we had designed for the previous clients.
Together we talk about the joys and the challenges of site where we were creating these earthworks. Over the previous summer the whole landscape had burned in a wildfire and the clients there are especially motivated to mitigate the risks moving into the future. We also got to work with a team with a variety of experiences and talents which contributed to the creativity and the outcome of the project.
In just over 3 days of work we were able to build a small infiltration basin in an eroded valley and an infiltration terrace along a fire-prone ridge with many unique features in each.
Follow us as we take your through the full process in this episode
Informations
- Émission
- FréquenceChaque semaine
- Publiée1 novembre 2024 à 06:00 UTC
- Durée1 h 7 min
- Épisode364
- ClassificationTous publics