
Successful project execution: Tunneling under a mountain to lay a wastewater line, a discussion with HardRock Infrastructure
Underground Infrastructure sat down with Cory Baker, Chief Operating Officer, HardRock Infrastructure, for an in-depth discussion on the company's 1,740-ft tunneling project for El Paso Water, which involved running a wastewater line underneath a mountain. The discussion includes challenges and the solutions that were used to successful complete the project.
المعلومات
- البرنامج
- معدل البثيتم التحديث كل أسبوعين
- تاريخ النشر٢٧ مايو ٢٠٢٥ في ٢:٤٦ م UTC
- مدة الحلقة١٦ من الدقائق
- التقييمملائم