
Successful project execution: Tunneling under a mountain to lay a wastewater line, a discussion with HardRock Infrastructure
Underground Infrastructure sat down with Cory Baker, Chief Operating Officer, HardRock Infrastructure, for an in-depth discussion on the company's 1,740-ft tunneling project for El Paso Water, which involved running a wastewater line underneath a mountain. The discussion includes challenges and the solutions that were used to successful complete the project.
信息
- 节目
- 频率两周一更
- 发布时间2025年5月27日 UTC 14:46
- 长度16 分钟
- 分级儿童适宜