Tough Times with Lou Young - Show #80 - August 10th, 2024 - CANADIAN CONNECTION

Tough Times with Lou Young

CANADIAN CONNECTION:  It may be the longest extension cord in the world and it's being installed right now.  The 339 mile long Champlain-Hundson Power Express (CHPE) will ultimately deliver electricity from Quebec to Queens NY, moving along the lake and river bottoms and alongside Route 9W in Rockland County to supply a sizable chunk of NYC's power for the 21st Century.  The crew at "Tough Times" looks at the remarkable project that is supposed to transmit primary hydro-generate electricity to the world's most lucrative power market.  There ARE questions though.  Who guarantees the energy will be renewable?  How long will businesses along the route be disrupted?  Why is none of the energy being made available to the communities the line is passing under/and through?  Tough talk from stakeholders, officeholders, and microphone holders to a soundtrack of electric music.  Eddy Grant, AC/DC, Katy Perry, Quicksilver Messenger Service, and Richie Havens bring the tunes.

Reverend Billy brings the EarthChxrch sermon.  Savitri D and News from the Natural World and, as always, The Stop Shopping Choir.  Two hours to cherish.

若要收聽兒少不宜的單集,請登入帳號。

隨時掌握此節目最新消息

登入或註冊後,即可追蹤節目、儲存單集和掌握最新資訊。

選取國家或地區

非洲、中東和印度

亞太地區

歐洲

拉丁美洲與加勒比海地區

美國與加拿大