The Determined People Podcast
Hello! Welcome to The Determined People Podcast, hosted by John Harrell, bestselling author, inspirational speaker, blogger and now podcaster. The Determined People Podcast is a two-pronged approach to podcasting. Every day I offer a 30 second inspirational message designed to start your day the right way. It’s not rah-rah stuff or fluff. The messages are designed to make you think, to inspire you, and to sustain you as you face the unknown challenges of the day. Bi-weekly I post interviews with real people who have honest, relatable stories. People who are willing to share their experience, strength and hope from their own life’s difficulties. When you listen to their stories, it is my hope you think, if they made it, so can I. Our world needs hope, and everyone I meet has a story. All of us have faced difficulties. In fact, we are facing one now…the global pandemic which has compromised our lives, our mental health and has impacted all of us uniquely. By sharing our stories, we connect at the heart level. We are unguarded. And through podcasting, these stories are available whenever you need them. So let’s get started.
Always Compelling, Original & Informative!
11/03/2022
John’s podcasts are “Always Compelling, Original & Informative!” Every interview John hosts is 5 Star!
The Gift of Time
04/11/2021
I love listening to John’s podcasts. Like John, they are always uplifting and positive!
An inspiring podcast worth subscribing to
05/07/2021
I love John’s The Determined People Podcast. John is a determined and inspirational person. Each interview is is filled with pearls of wisdom and practical takeaway points. He’s not afraid to ask the difficult questions. I also love his one minute mini-casts. John says a lot in a short period of time. I subscribed and I listen often, sometimes more than once. Vic Feazell.
Insightful and Inspiring
20/06/2021
As a recent guest on John’s podcast, I was deeply impressed with his insightful questions and passion for telling stories that inspire. He’s a great host, dives deep and keeps the topic moving, and is authentic and wise.
Sobre
Informações
- Criado porJohn Harrell
- Anos de atividade2020 - 2024
- Episódios1,4 mil
- ClassificaçãoLivre
- Copyright© 2024 The Determined People Podcast
- Site do podcast