“No utility approval required” is not a universal permission slip. In this episode, Lisa and Mike separate the processes that are often confused: utility notice, registration, approval, interconnection agreements, fees, and the separate code, fire, local, landlord, lease, or HOA questions that a state utility exemption does not settle. The guide compares five enacted frameworks—Maryland, Connecticut, Maine, Colorado, and Virginia—using their different deadlines, output limits, notice sequences, and eligibility conditions. Maryland requires notice before installation. Maine’s higher-output pathway requires notice within 30 days after installation. Colorado permits a provider to require notice but not prior approval for a qualifying device. Connecticut’s qualifying-device provision becomes effective October 1, 2026. Virginia’s notice process begins January 1, 2027 and is not current installation authorization. The discussion is about qualifying devices and enacted frameworks, not legal advice or an electrical design. Before purchase or installation, match the exact device, output, outlet or circuit plan, serving utility, meter treatment, and property rules to the current requirements for the address. Chapter Markers 00:00 — Intro music 00:04 — Cold Open: “No approval” does not mean “no action” 00:57 — Notice, approval, and agreement: The terms to keep separate 02:08 — Maryland: Advance utility notice before installation 02:49 — Connecticut: Qualifying-device relief effective October 1 03:42 — Maine: Post-installation notice for the higher-output pathway 04:36 — Colorado: Provider notice may be required 05:37 — Virginia: The future 2027 notification process 06:40 — Bottom Line: A precise pre-purchase checklist 07:26 — Outro 08:04 — Outro musicKey Takeaways 1. Notice and approval are different actions. A state may require notice, remove an approval or agreement step for a qualifying device, or create a framework that is not effective yet. Those outcomes should not be treated as interchangeable. 2. The state sequence matters. Maryland uses advance notice. Maine’s notice applies within 30 days after installation when combined inverter output exceeds 420 watts. Colorado permits provider notice. Connecticut’s provision takes effect October 1, 2026, and Virginia’s begins January 1, 2027. 3. Keep utility rules separate from safety and property rules. A qualifying-device utility exemption does not automatically settle product listing, circuit suitability, code, fire, permit, meter, tariff, landlord, lease, HOA, or local-authority requirements. Links & Resources Read the full article: Do I Have to Tell My Utility About Plug-In Solar? Notice vs. Approval by StateMaryland Public Service Commission: Balcony SolarConnecticut Public Act 26-127Maine Public Law 2026, Chapter 644Colorado House Bill 26-1007Code of Virginia § 56-596.8PluginSolarUS State TrackerPlug-In Solar Buyer’s GuidePlug-In Solar, Explained is the podcast from PluginSolarUS.com—helping every American lower electricity bills and build energy resilience, honestly. Learn more at PluginSolarUS.com.