Performance measures are meant to improve performance — but what happens when they do the opposite?
In this episode, we explore a real-world style scenario involving Ken and Barbie, two employees in the same organisation, and a well-intentioned performance target that ends up driving dysfunctional behaviour.
Using this story, we break down:
How employees “game” poorly designed targets
What ACCA PM means by dysfunctional behaviour
How this links directly to the Building Block Model
A must-listen for ACCA PM/APM students looking to strengthen their evaluation skills and avoid common exam traps.
Information
- Show
- FrequencyUpdated Daily
- PublishedDecember 29, 2025 at 12:01 PM UTC
- Length9 min
- Season1
- Episode16
- RatingClean
