
Successful project execution: Tunneling under a mountain to lay a wastewater line, a discussion with HardRock Infrastructure
Underground Infrastructure sat down with Cory Baker, Chief Operating Officer, HardRock Infrastructure, for an in-depth discussion on the company's 1,740-ft tunneling project for El Paso Water, which involved running a wastewater line underneath a mountain. The discussion includes challenges and the solutions that were used to successful complete the project.
정보
- 프로그램
- 주기격주 업데이트
- 발행일2025년 5월 27일 오후 2:46 UTC
- 길이16분
- 등급전체 연령 사용가