Residents of 1 Grand Army Plaza — a sleek, all-glass condo in Brooklyn — struggled with sweltering corridors and soaring repair bills, and set out to find why. Unfortunately, the “why” turned out to be a fundamental design flaw in the building’s ventilation system. The fix, shared by Amalia Cuadra, senior director of engineering at En-Power Group, was a phased capital project that not only restored comfort but also cut energy use, improved the building’s letter grade, and reduced carbon emissions — without blowing the budget. Cuadra urges boards to think beyond “replace A with A” and instead take a holistic, forward-looking approach to capital upgrades, which this Brooklyn condo successfully did. Habitat’s Emily Myers conducts the interview.
Thanks for listening. Subscribe to this podcast for more stories on how New York co-ops and condos have solved a myriad of problems. Brought to you by Habitat Magazine, the "bible" that hundreds of board directors turn to every day!
정보
- 프로그램
- 주기월 2회 업데이트
- 발행일2025년 11월 3일 오후 6:00 UTC
- 길이16분
- 시즌3
- 에피소드19
- 등급전체 연령 사용가
