In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

In today's episode, we talk about the counterintuitive process of prioritizing based on critical path. This is not a novel concept that I've invented, but rather a revisiting of the classic discussion started by Eli Goldratt in his book "The Goal", and later in his book "Critical Path", based on the theory of constraints.

13 min

Top Podcasts In Technology

Acquired
Ben Gilbert and David Rosenthal
All-In with Chamath, Jason, Sacks & Friedberg
All-In Podcast, LLC
Search Engine
PJ Vogt, Audacy, Jigsaw
Lex Fridman Podcast
Lex Fridman
Hard Fork
The New York Times
TED Radio Hour
NPR

More by Spec.

Developer Tea
Jonathan Cutrell
Design Details
Brian Lovin, Marshall Bock
Swift Unwrapped
JP Simard, Jesse Squires, Spec Network, Inc.
Fragmented - An Android Developer Podcast
Donn Felker, Kaushik Gopal
Does Not Compute
Sean Washington, Rockwell Schrock
Toolsday
Una Kravets, Chris Dhanaraj